AsClear Blasting and Coating

Category:

Blasting and Coating

Project:

Kipper Tuna Turrum Project

Location:

Barry’s Beach Marine Terminal, Victoria

About this Project:

AsClear Pty Ltd prepared spool and flanges for coating of HBE95 at ESSO’s Barry Beach Marine Terminal site with spool sizes varying including 6,8,14 & 18 inch.  The materials coated included Carbon Steel, Corrosion Resistant Alloys and Duplex stainless Steel.

All blasting and coating was conducted inside a habitat to help control the coating environment and protect personnel, buildings and equipment from garnet dust and overspray.  HBE95 was applied by plural spray application.