Projects
ESSO Crude Oil Pipeline
Project Type
Blasting and Coating
Location
Longford to Long Island Point
About this Project
Esso Australia Pty Ltd transports crude oil along a predominately underground 180km pipeline from Longford to Long Island Point (Victoria). This pipeline has been in operation since the late 1960’s and is currently undergoing refurbishment. AsClear was chosen to remove the existing coal tar and coat the pipe with epoxy resin. This resin is heated and sprayed whilst the pipe is in the ground thereby ensuring the integrity of the pipe for years to come.