ALINTA
Alinta Energy required a refurbishment of the Condenser Return Water Boxes during the 2020 outage. AsClear removed all the old internal coating and repaired cavities in the internal walls by use of a metal filler before spray applying a 2-part epoxy coating suitable for immersion. Once the outage was over and the units back in…
Read MoreAPA (M80 Upgrade)
The M80 Upgrade will widen the freeway, widen on and off ramps and install a new freeway management system along 38km of road from Laverton North to Greensborough. The project will increase capacity, improve safety and create more reliable travel times for the 165,000 motorists who use this road each day. AsClear abrasive blasted and…
Read MoreNational Australian Pipeline
Due to widening of road works above APA required their below ground pipework to be refurbished. AsClear removed the existing coal tar enamel and re-coated the pipe with an ultra-high build epoxy in accordance with APA specifications.
Read MoreQuality Site Welding
Sibelco required silos to be abrasive blasted and coated prior to install at Galong. AsClear completed the job on site and on schedule to the customers satisfaction.
Read MoreQCLNG Pipeline
AsClear Pty Ltd prepared pipes and coated bends with Canusa HBE95 at MCJV site in Queensland. All blasting and coating was conducted inside a habitat to help control the coating environment and protect personnel, buildings and equipment from garnet dust and paint overspray. HBE95 was applied by plural spray application.
Read MoreESSO Crude Oil Pipeline
Esso Australia Pty Ltd transports crude oil along a predominately underground 180km pipeline from Longford to Long Island Point (Victoria). This pipeline has been in operation since the late 1960’s and is currently undergoing refurbishment. AsClear was chosen to remove the existing coal tar and coat the pipe with epoxy resin. This resin is heated…
Read MoreKipper Tuna Turrum Project
AsClear Pty Ltd prepared spool and flanges for coating of HBE95 at ESSO’s Barry Beach Marine Terminal site with spool sizes varying including 6,8,14 & 18 inch. The materials coated included Carbon Steel, Corrosion Resistant Alloys and Duplex stainless Steel. All blasting and coating was conducted inside a habitat to help control the coating environment…
Read MoreWollert – Wodonga Pipeline
Following the removal of an existing yellow jacket coating, the mainline was abrasive blasted and coated with Canusa HBE95.
Read MoreQSN3 – Warrego River
Creation of full enclosure of HDD String for abrasive blasting and painting in extremely sensitive environmental conditions. A partial enclosure for painting was erected to provide protection from the wind and dust. Coating was undertaken with Canusa – HBE95.
Read MoreSibelco – CD Bin & Trommel
Sibelco needed to replace an old CD Bin and Trommel at their Lang Lang facility. A whole new assembly was fabricated that included CD bins, platforms, chutes, trommel’s (one spare) support frames, handrail and a boil box. The paint required on the structure had to be robust to protect the steel from the unfriendly and…
Read More